Historical Flow Analysis |
|||||
Historical flow analysis of the Clark Fork River by Representative Verdell Jackson As noted in Chapter 6, in
trying to understand the significance of the existing hydropower water rights in the lower Analysis
Presented by Representative Verdell Jackson Rep. Jackson
considered information about water use and flows and state statutes to determine if Avista’s hydropower water rights
present a problem for existing and future water use in the basin. He concluded
that one cannot demonstrate now that the Avista rights present a problem for the Existing Basin Water Resources The subbasin has abundant surface and groundwater
resources. The Flathead drainage has 3,500 miles of streams and 450 lakes including
Bad Data and Data Gaps The existing data base on water appropriations
and use can not be used to demonstrate that all of the water has been allocated in the Flathead subbasin because of missing
and duplicate data. In the initial draft of chapter 3 on the watershed profiles,
a consultant wrote, “Information describing existing appropriations of water represents the most significant gap in
information and knowledge required for basin planning and management. As a whole
it cannot be considered to be accurate, consistent, and reliable.” The
problems with this data include: $
The failure of existing water appropriations
to specify consistently the period of use. $
The rate and volume are not separated
by use for each water right identification number. For a given identification
number, either a rate or a volume were commonly found, but not both. $
Multiple entries for an identification
number were found approximately 43% of the time. $
Priority dates were missing in
some cases. Also, in the water rights data, consumptive
uses are not separated from non-consumptive uses. Non-consumptive uses dwarf
consumptive uses. Less than 1 million acre-feet in 76LJ ( Implication of Basin Water Use
for Avista’s Water Rights As of June 2, 1998, The impact of total basin irrigation on
water available to Avista at its Noxon Rapids project is estimated in the following table.
Average yearly flow of Table
A4-1 Acres Irrigated Allotted Used Consumed
Annual Flow 470,000
ac
X 2.5 ac/ft X
.67
X .56
= 440,860 ac/ft
3.03% 428,000 ac X
2.5 ac/ft X .67
X .56
= 401,464 ac/ft
2.76% 411,000 ac X
2.5 ac/ft X .67
X .56
= 385,518 ac/ft
2.65% Thus using three different estimates of the basin’s
irrigated acreage, basin irrigation consumes between 2.65% and 3% of the average annual river flow at Plains. Irrigation has traditionally been the largest water user. As is seen in Table A4-2, the growth in irrigation
from 1950 to 1980, using data from the 1983 Depletion Task Force Report, consumes only about 0.44% of the average annual flow
of the Table A4-2 Total Acres Water
Average
Average
Percent Irrigated Allotted Used Consumed Depletion Prior to 1950 358,000 ac X2.5 ft/ac
X.67 X.56
= 335,000 ac/ft
2.3% 1950-1980 69,000 ac X2.5 ft/ac
X.67 X.56
= 64.000 ac/ft
0.44% Total
427,000ac X2.5 ft/ac X.67 X.56
= 400,526 ac/ft
2.75% However, this figure is overstated because when
the irrigated acreage was compiled, the irrigated acres were double counted in the reservoir records and change of use authorizations. According to the Cunningham Report, between the years of 1950 to 1980 the additional
water use was 60,600 acre-ft, which is .4% of the average annual flow in acre-ft at Noxon Rapids. The Cunningham Report further concluded: “In the early
1950s Hungry Horse Dam was completed and has provided flow benefits to WWP (Avista) at both Noxon Rapids and Cabinet Gorge
Dams. It can be argued that these modified flow releases from Hungry Horse dam
have mitigated any power losses that would have occurred from increased irrigation depletions in the Flathead.” Because additional development of irrigated acreage in the basin is very small, the
development will not have an adverse impact on Avista’s hydro power water supply.
Also, agricultural land is being converted to residential and commercial at a very high rate. Historic River Annual Average Flow
Data The USGS data on historic annual average river
flow at Polson, St. Regis, and Plains are shown below in Tables A4-3, A4-4, and A4-5, respectively. These data show that the 45 year average river flow since Avista built its hydroelectric dam at Noxon is
higher than the preceding 45 year average. This is true at all three water measuring
sites: Polson, St. Regis and Plains. Also,
the average for the last 10 years at each site is higher that the average for the last 45 years. There is no evidence from the water flow data for the Flathead River and the Historic River Monthly Average Flow
Data Table A4-6 shows the monthly average
flows in the April and September through December
than for the 45 years preceding the Dam, 1911-1955. Thus using monthly flow data,
Rep. Jackson concluded that no measurable negative impact on Avista’s water rights occurs as a result of farm and ranch
land irrigation during the summer months or at any other time. The use of storage
behind Hungry Horse Dam and in
Historic River Daily Average Flow Data Figures A4-1 and A4-2 show the
USGS data on daily flows at Plains for two periods, 1910-1954 and 1955-2001. Plotted
on the two charts is the average daily flow. Again from this data, Rep. Jackson
concluded that the data do not demonstrate that the water development since construction of the Noxon Project has had a significant
adverse impact on Avista water rights or water use when all of the data from the 92 years of USGS records are included. Monthly averages mitigate
high water flows during the month and therefore underestimate the rate of water flow into Avista on a daily basis. Since Avista has minimal storage capacity, it is considered to be a “run of the river” electricity
generation facility. An analysis of the water flow from 1911 to 2000 reveals
that water flows into Avista exceeds their capacity to generate (50,000 cubic
feet per second (ft3/sec) during April, May, June and July, thus resulting in spills. Spills happen about 9 out of every 11 years or 82% of the time. Based on 45 years of daily
water flow data on the After Hungry Horse was built
in 1955 and began operating, calculations show that only 878,786 ac/ft per year of water was potentially spilled because the
combination of Hungry Horse and During the last 10 years the
operation of Hungry Horse has taken even more of the peak run off during May and June and added it to the flows in August,
November and December. The average spillage for the last 10 years has now been
decreased to 670,948 ac/ft per year which increases the average amount available per year to Avista up to 921,374 ac/ft. This amounts to about 6 ½ % of the average flow of the Based on data from the 1983 Depletion Task Force Report, 69,000 acres were converted to irrigation between 1950 and 1980. These irrigators would be junior water users to Avista’s 1950 water right and
subject to a call by them. The water depletion attributed to these junior users
is estimated to be 64,000 ac/ft. See table A4-2.
This amount of increased water use by irrigators since 1950 is a meager
7% of the extra water Avista is able to utilize as a result of the water management by Hungry Horse Dam. Analysis of the
Likelihood of a Call on Junior Water Users or a Basin Closure to New Water Rights
Avista should NOT make a call
on junior water users or push for a basin closure to new water rights for the following reasons: 1. The operation of Hungry Horse dam has totally mitigated the impact of irrigation on water available to
Avista for the present and the future. The total amount of irrigated land in
the 2. Although Avista has a right according to Montana water law to make a water call on junior water users,
they must also prove that the water will arrive at Avista in sufficient quantities at the right time to have a measurable
impact on their production of electricity. 3. The timing of irrigation occurs when the most water is available.
The winter run off starts late in April and peaks in May or June and ends early in July. Irrigation starts early in May, tapers off in August and ends in September.
Irrigators take most of their water during high flows and about half of that water returns to the river during late
summer and fall. It is very likely that irrigators consume a portion of water
and also store a portion of water in the ground that would have spilled at Avista during May and June. Later in the summer and during the fall a portion of the ground water returns to the river and is utilized
by Avista. 4. Most of the irrigation water rights are senior to Avista’s 1950 senior water right of 35,000 cps. The only irrigation water rights in danger of a call by Avista would be those with
a priority date after 1950. The number of water rights that are junior to Avista’s
1976 water right of 15,000cps is 3,125 out of a total of 26,274 water rights. The
amount of water consumed by these junior water users would be very difficult to determine.
The make up of the junior water rights is 40% irrigation, 32% municipal, 16% stock and 12% unknown. The number of irrigated acres added between 1950 and 1980 is estimated to be 69,000. The amount of water involved to irrigate that much land would be less than ½ % of the total water available
from the 5. There are many characteristics of Avista’s water right that indicate that the water right was crafted
to enable Avista to maximize their use of the maximum rate and volume that would be available in the Avista’s water
rights 1951: Rate: 35,000 cfs, Volume 25,338,843 ac/ft per year 1959: Rate: 5,400 cfs, Volume 3,909,421 ac/ft per year 1974: Rate rose to 50,000 cfs Over a period of years (1951
to 1974), Avista continued to request more water rate from DNRC until the total reached 50,000 cfs. This rate is 2 ½ time the average rate of flow of the Each request for additional
rate and volume of water was approved without specifying the period of time when the rate was available. Since there is no detail in the water right certificate protecting water rights senior to Avista’s
water rights or future use of water for commercial or residential development in the 6. Examining the 92 years of flow data over any averaging period
one chooses: annual, monthly or daily, average flows in the lower 7. The calculations done on a daily basis are more accurate than the calculations that were done using monthly
averages. Monthly averages mitigate high water flows during the month and therefore
underestimate the rate of water flow into Avista on a daily basis. Since Avista
has minimal storage capacity, it is considered to be a “run of the river” electricity generation facility. An analysis of the water flow from 1911 to 2000 reveals that water flows into Avista
exceeds their capacity to generate (50,000 cps) during April, May, June and July, thus resulting in spills. Spills occur about 9 out of every 11 years or 82% of the time. This
is assuming that Avista operates its dam to make maximum use of the water available. 8. Water for irrigation was
part of the justification for building Hungry Horse Dam. The Bureau of Reclamation
filed a water right of 500,000 ac/ft when the Hungry Horse dam was built to provide additional water for irrigation. It is unlikely that this water will be needed by irrigators because development is
causing a net decrease in the amount of land being irrigated. However, this water
should be available to the citizens of 9. Spillage of 671,000 ac/ft at Avista indicates that more storage and/or irrigation are necessary to get
maximum value from Avista’s facilities. Avista should be encouraging reservoirs
and other means of storage to be built and filled during peak flows. An additional reduction of spillage of 7% would most likely completely mitigate the entire amount
used by junior water users. 10. Public relations are very important to out of state corporations doing business in Subordination
of Cabinet Gorge’s Water Rights When Washington Water Power began to construct the
Cabinet Gorge hydropower facility across the 85-1-122. This language subordinates any |
||||